Guide · Start here
What is FCC certification?
Certification is the strictest of the two FCC equipment authorization procedures. The rules are in 47 CFR Part 2, Subpart J. A certified device is listed in the FCC’s public Equipment Authorization System with its FCC ID, grant date, test reports, photos and user manual. When people say a product is “FCC certified” or has “FCC approval”, this grant is what they mean.
Is FCC certification required for my device?
It depends on whether the device transmits on purpose:
- Intentional radiators (Wi-Fi, Bluetooth, cellular, key fobs, RFID readers) need certification.
- Unintentional radiators (computers, peripherals, most digital electronics) can usually use SDoC. Under § 15.101, only a few types, such as scanning receivers and radar detectors, must be certified.
- A product with a radio module is a mix: the radio needs certification, and the rest of the device may use SDoC.
Certification vs SDoC
| Certification | SDoC | |
|---|---|---|
| Typical devices | Transmitters: Wi-Fi, Bluetooth, cellular | Digital devices without a transmitter |
| Testing | FCC-recognized accredited lab | Any lab the responsible party chooses |
| Who approves | A TCB issues the grant | No approval; the responsible party declares compliance |
| FCC ID | Yes | No |
| Public record | Yes, in the FCC database | No |
| Who is responsible | The grantee | A US-based responsible party |
The certification process, step by step
- Get a grantee code from the FCC (a one-time step for each company).
- Test the device at an FCC-recognized accredited lab.
- Prepare the application: test reports, photos, user manual, label drawing and block diagram.
- Submit to a TCB, which reviews the file and asks questions.
- The TCB issues the grant, and the record appears in the FCC database.
- Label the device with its FCC ID and start selling.
Who issues the grant?
Most grants today are issued by TCBs. They are private bodies that the FCC recognizes for specific scopes of equipment. The FCC keeps oversight: it can review any TCB decision. After the TCB’s 30-day window, only the FCC can revoke a grant (§ 2.962). More in What is a TCB?.
How long does it take and what does it cost?
Timing and cost depend on the number of radios in the device, the FCC rule parts that apply, and whether RF exposure testing is needed. A device with a single Bluetooth or Wi-Fi radio usually moves from testing to grant within a few weeks. Devices with cellular radios, or with several radios that transmit at the same time, need more testing and take longer. For a quote and timeline for your device, talk to 360Compliance’s certification experts.
After the grant: labeling and changes
The device must carry its FCC ID on a permanent label or an approved e-label (see FCC ID label requirements). Later hardware or software changes may be allowed under the same FCC ID as a permissive change. Larger changes need a new application.
To see what a finished grant looks like, open a real record, such as FCC ID 2BSMA-BS3001-001.
Look up an FCC ID
Sources
- 47 CFR Part 2, Subpart J: Equipment Authorization Procedures
- FCC Equipment Authorization System (public records)
Related guides
- What is an FCC ID? An FCC ID is the unique code the Federal Communications Commission uses to identify a device that has been certified to its radio frequency rules. It is made of two part…
- What is a TCB? A TCB, or Telecommunication Certification Body, is a private organization the FCC recognizes to review applications and grant FCC certification. When a device gets an FC…
- FCC Part 15 explained FCC Part 15 is the set of US rules for electronic devices that emit radio energy and can operate without a license. It covers both devices that transmit on purpose, like…